Alsyed Construction
Since the inception of the AlSyed Construction company, which is located in Gujrat, Punjab, Pakistan, we work hard to our level best to make a strong statement in this field and by the grace of God we have earned much appreciation.
Office Hours
Sat – Thu:
9:00 am – 5:00 pm
Friday:
Closed
Contact Info
Address:
Gujrat, Punjab, Pakistan
Phone:
+92 333 0270001
Email: info@alsyedconstruction.com


Using 2×12 for Stair Treads: Size, Span & Installation Guide
2×12 Lumber: Sizes, Uses, Grades & Construction Guide
How Far Can a 2×12 Floor Joist Span? Complete Guide
How Much Weight Can a 2×12 Hold? Load Capacity Explained
2×12 Actual Dimensions: Actual Size, Width & Thickness
2×6 vs 2×8: Strength, Span, Floor Joists & Uses
2×8 Floor Joist Spacing: 12, 16 & 24 Inches O.C. Guide
How Far Can a 2×8 Floor Joist Span? 2×8 Span Chart
How Much Weight Can a 2×8 Hold? Load Capacity Guide
Actual Size of a 2×8 Lumber in Construction in the USA
What Is a 2×6? Size, Meaning, Uses & Framing Guide
What Is a Mock-Up in Construction? Meaning, Types, Uses & Inspection