Requisition in Construction in Bahrain: A Comprehensive Guide


Understanding Requisition in Construction

In the construction industry, the term requisition plays a critical role in the procurement and material management process. A construction requisition refers to the formal request made by project teams for the acquisition of materials, tools, equipment, or services required to complete a project efficiently.

In Bahrain’s construction sector, the requisition process ensures that materials and resources are acquired on time, within budget, and in compliance with regulatory requirements. Efficient requisition management helps prevent project delays, cost overruns, and material shortages.

Types of Requisition in Construction

1. Material Requisition

A Material Requisition (MR) is a document submitted by a project manager, engineer, or site supervisor to procure specific construction materials. It includes:

  • Material description and specifications
  • Quantity required
  • Preferred supplier or vendor
  • Delivery date and location

In Bahrain, material requisition forms are standardized and must comply with construction regulations to ensure quality control and safety standards.

2. Purchase Requisition

A Purchase Requisition (PR) is a formal request submitted to the procurement department to approve and process the purchase of materials, equipment, or services. The PR acts as an internal authorization document before placing an official purchase order (PO).

Key components of a Purchase Requisition:

  • Requestor details and department
  • Justification for the purchase
  • Estimated costs and budget approval
  • Vendor selection criteria

3. Equipment Requisition

Heavy machinery and specialized tools are essential for large-scale construction projects in Bahrain. An Equipment Requisition (ER) is submitted when construction firms need to rent, lease, or purchase machinery such as:

  • Cranes and excavators
  • Concrete mixers and batching plants
  • Scaffolding and formwork systems
  • Safety equipment and protective gear

4. Service Requisition

A Service Requisition (SR) is used to request professional or technical services required for construction. This may include:

  • Consulting engineers and project managers
  • Surveying and land assessment services
  • Testing and quality control services
  • HVAC, electrical, and plumbing contractors

The Requisition Process in Construction Projects

1. Identifying the Requirement

The project team identifies the need for materials, equipment, or services based on the project plan, blueprints, and work schedules.

2. Preparing and Submitting the Requisition Form

A detailed requisition form is prepared, specifying:

  • Item descriptions and technical specifications
  • Estimated costs and budget allocations
  • Required delivery timelines
  • Approval signatures from project managers

3. Review and Approval

The procurement department or project management team reviews the requisition to ensure:

  • Budget compliance
  • Vendor qualification and selection
  • Adherence to Bahrain’s construction regulations

4. Issuing a Purchase Order (PO)

Once approved, the purchase requisition is converted into a purchase order (PO), which is sent to the selected supplier.

5. Delivery and Inspection

Upon delivery, the materials or equipment undergo quality checks to ensure they meet the specified standards and project requirements.

Challenges in Construction Requisition Management in Bahrain

1. Delays in Procurement

Due to logistical challenges and supply chain disruptions, some materials may take longer than expected to arrive, impacting project timelines.

2. Budget Constraints

Construction projects often face budget limitations, requiring strict cost management and negotiation with suppliers to ensure affordability.

3. Regulatory Compliance Issues

In Bahrain, all materials and equipment must comply with Bahrain Building Code (BBC) standards. Improper documentation or non-compliance may result in project delays and penalties.

4. Vendor Selection Challenges

Selecting the right supplier or contractor is crucial. Factors such as pricing, delivery timelines, and quality assurance must be evaluated before finalizing procurement decisions.

Best Practices for Effective Requisition Management

1. Standardizing the Requisition Process

Implementing standardized requisition forms and approval workflows reduces errors and improves efficiency.

2. Using Construction Management Software

Digital solutions like SAP, Oracle, and Procore help streamline requisition tracking, vendor management, and budget allocation.

3. Establishing Long-Term Supplier Relationships

Building strong partnerships with reliable vendors ensures consistent material supply and cost benefits.

4. Conducting Regular Audits and Quality Control

Periodic inspections and audits ensure procurement accuracy and compliance with safety standards.

Future Trends in Construction Requisition in Bahrain

1. Digital Procurement Systems

Construction companies are shifting to online procurement platforms, allowing faster approvals, real-time inventory tracking, and automated vendor selection.

2. Green Building Materials

With Bahrain’s focus on sustainability, eco-friendly construction materials are gaining popularity, requiring new procurement strategies and supplier sourcing.

3. AI and Automation in Procurement

Artificial intelligence is enhancing supply chain efficiency, enabling predictive demand analysis and automated purchase requisitions.

Conclusion

A well-structured requisition process is essential for successful construction projects in Bahrain. By adopting efficient procurement strategies, digital solutions, and best practices, construction firms can optimize costs, minimize delays, and ensure regulatory compliance.

Read the competing article here