What Is T&M Contract in USA: A Comprehensive Guide to Time and Materials Agreements

Overview of T&M Contracts in the United States

A Time and Materials (T&M) contract is a widely used contractual agreement in the U.S. construction and service industries, especially where the scope of work is uncertain or subject to change. Under this model, contractors are compensated for the actual time spent on a project, along with the materials used to complete it. This contract type offers a high degree of flexibility and is favored for projects with evolving requirements.

A T&M contract in the USA includes predefined labor rates, markups on materials and equipment, and specific billing practices. It provides transparency for clients and safeguards for contractors working in unpredictable environments.


Core Elements of a T&M Contract

Defined Labor Rates

In a T&M agreement, labor charges are based on agreed-upon hourly rates. These rates differ by role and skill level and are critical in determining the total cost. A well-structured contract lists the following categories:

  • General laborers: typically between $30–$55 per hour
  • Skilled tradespeople: such as electricians or plumbers, ranging from $60–$100 per hour
  • Supervisors/project managers: often billed at $100–$150 per hour

Each labor category should be itemized with clearly defined responsibilities and rates to avoid disputes.

Material Cost Reimbursement

All materials used during a project are billed back to the client at cost, often with a markup percentage (commonly 10% to 25%) to cover administrative and handling expenses. Contractors must submit detailed receipts and supporting documentation to justify the expenses.

Examples of reimbursable materials include:

  • Lumber, concrete, wiring
  • HVAC systems or components
  • Plumbing fixtures and piping
  • Paint, coatings, and finishing products

Equipment Usage Charges

Use of construction equipment or tools can be billed based on either rental rates or ownership cost recovery. Rates may be charged:

  • Hourly for small tools
  • Daily/weekly for heavy equipment
  • Flat-rate per project for specialized machinery

All usage must be logged and approved to be included in the invoice.

Subcontractor Costs and Third-Party Services

Any work subcontracted to external vendors is billable under a T&M contract. Subcontractor charges are usually accompanied by a markup of 10–15%, and must be backed with contracts, time logs, and invoices.

Administrative and Miscellaneous Expenses

T&M contracts in the U.S. also often allow billing for additional job-related costs such as:

  • Travel and lodging
  • Permitting and inspection fees
  • Safety equipment and compliance certifications
  • Utility setup and temporary structures

When T&M Contracts Are Used in U.S. Construction

T&M contracts are ideal when the project scope is not fully defined at the outset or when speed is prioritized over fixed budgeting. Common scenarios include:

  • Emergency repairs or disaster recovery projects
  • Complex renovations or retrofits
  • Design-build construction projects
  • Government service contracts under FAR regulations
  • Technology system integration or installation services

This contract model supports iterative project development, enabling work to proceed without waiting for complete design finalization.


Benefits of a T&M Contract in U.S. Markets

Greater Flexibility for Changing Conditions

A T&M agreement allows contractors and clients to adapt to unforeseen changes in materials, design, or labor requirements. This flexibility can be crucial in dynamic project environments.

Transparent Cost Tracking

All charges are based on real-time usage and verified documentation, providing a clear and traceable record of spending. Clients can audit and track every expense down to the hour or component.

Reduced Risk for Contractors

Unlike lump-sum contracts, where underestimation can lead to losses, T&M contracts protect contractors from unexpected cost increases, as all labor and materials are compensated according to actual usage.


Challenges and Limitations of T&M Agreements

Cost Uncertainty for Clients

T&M contracts do not offer a fixed price, which means final project costs can exceed initial expectations. To manage this, many agreements include a Not-to-Exceed (NTE) clause to cap spending.

Documentation Requirements

Because every expense must be justified, these contracts require meticulous record-keeping, including:

  • Daily labor logs
  • Timesheets
  • Purchase receipts
  • Equipment usage logs

Failure to maintain thorough documentation can delay billing or lead to payment disputes.

Potential for Inefficiency

If not managed carefully, a T&M contract may lead to inefficiencies or overbilling, as contractors have less incentive to control hours or material consumption. This can be mitigated with project audits, milestone reviews, and performance tracking.


Best Practices for Structuring a T&M Contract in the United States

To ensure a successful T&M agreement, we recommend including the following elements:

  • Clearly defined hourly rates by labor category
  • Markup percentages for materials, equipment, and subcontractors
  • Billing intervals (e.g., weekly, bi-weekly, or monthly)
  • Detailed documentation requirements
  • Caps on overall cost (NTE clauses)
  • Process for resolving disputes or change orders
  • Termination clause with notice periods

These provisions help align expectations and minimize the potential for miscommunication or financial discrepancies.


Real-World Example: A T&M Contract in Action

A commercial building retrofit project may involve multiple trades and design changes mid-construction. In such a case:

  • Labor: 100 hours of journeyman electrician @ $90/hr = $9,000
  • Materials: Lighting fixtures and wiring = $7,200 (+15% markup = $8,280)
  • Equipment rental: Lift equipment for 4 days @ $250/day = $1,000
  • Subcontractor: Fire alarm technician @ $3,000 (+10% markup = $3,300)
  • Total invoice: $21,580

This invoice would be backed by daily logs, receipts, and subcontractor invoices, submitted according to agreed billing intervals.


Comparing T&M Contracts to Other Contract Types in the USA

Contract TypeCost PredictabilityRisk to ContractorRisk to ClientFlexibility
T&M ContractLowLowMediumHigh
Fixed-Price (Lump Sum)HighHighLowLow
Cost-Plus ContractMediumMediumMediumMedium

T&M contracts occupy a unique space in project delivery—offering the highest flexibility and lowest risk for the contractor, while placing the burden of cost oversight on the client.


Legal Considerations for T&M Contracts in the USA

T&M agreements must comply with applicable federal and state laws, including:

  • Contract licensing requirements
  • Union and prevailing wage agreements
  • Federal Acquisition Regulation (FAR) for public sector work
  • Lien laws and bonding requirements
  • Sales and use tax regulations

Including a governing law clause and having legal review ensures the contract is enforceable in the jurisdiction where the project is performed.


Technology and T&M Contract Management

Modern project management tools have transformed how T&M contracts are administered. Leading software includes:

  • Procore – time tracking, invoice generation, and reporting
  • QuickBooks for Contractors – labor logs and billing integration
  • Smartsheet and Buildertrend – real-time collaboration and cost controls

These platforms enable real-time expense tracking, automated invoice generation, and comprehensive project analytics, giving stakeholders more control and insight.


Conclusion: Why T&M Contracts Remain Essential in U.S. Contracting

The T&M contract in the USA is an indispensable agreement model for industries requiring agility, transparency, and real-time cost accounting. It supports project continuity without waiting for detailed scoping or fixed budgeting. By embracing this model, both contractors and clients can navigate complex project environments while maintaining clear cost controls and accountability.

With the right controls in place—documented labor, justified materials, agreed markups, and defined billing cycles—T&M contracts can serve as a robust foundation for successful project execution across a wide range of industries.


We stand ready to assist in structuring, managing, and optimizing T&M contracts to ensure clarity, efficiency, and financial control throughout every phase of your construction project.